How it works

How TVET.AI turns a document into checked findings

TVET.AI does the reading, cross-checking and first structuring of a gap analysis. Each step is recorded, and each one can be checked in the report.

Six steps, as the app shows them

  1. Read. The document is read three times, independently. Only issues the document itself states are kept.

  2. Check. A separate checker confirms that each issue is a need the document states, not a task for the consultant.

  3. Search. For each issue, one search in the reference library. Practice that has actually been implemented is looked at first.

  4. Pair. Each pairing of an issue with practice elsewhere is checked for relevance, faithfulness and concreteness. Rejected pairings are listed with their reason.

  5. Plan. Priority bands, project types and lab types come from fixed tables, not free text.

  6. Verify. Every quote is matched again, word for word, on its page. One failure and the report is held.

The report's Overview shows these six steps with the numbers from your own analysis.

What a finding looks like

Each finding reads in four steps:

  1. What your document says. The document's words, with their page.
  2. What others have done. Practice from a published source, with its place, whether it is in place or only planned, the publication and its page.
  3. The gap. Between what the document describes and that practice.
  4. What to fund. A priority band, a project type, where to start, and a typical budget and time range.

Under each finding, "How this finding was checked" shows the trail. An issue the document states but no practice could be paired with is still shown, on its own and outside the plan, never dropped.

Example finding · from a released analysis

Papua New Guinea · Teacher & Trainer Development

Capacity and qualification of TVET teachers

High priority
  1. 1 · What the document says

    “building the capacity and qualification of TVET teachers especially in priority sectors”

    Asian Development Bank, Technical Assistance Report, Papua New Guinea: Preparing the Improved Technical and Vocational Education and Training for Employment, September 2019 · page 6

  2. 2 · What others have done

    Philippines status not stated

    “In the Philippines, for example, requirements for the National TVET Trainers Certificate include a relevant national vocational certificate, training pedagogy certification, and industry experience, even though trainers can be allowed a grace period to obtain industry experience (TESDA 2019).”

    page 218 · Building Better Formal TVET Systems: Principles and Practice in Low- and Middle-Income Countries. The World Bank, UNESCO and ILO, 2023. Licence: CC BY-SA 3.0 IGO

  3. 3 · The gap

    The document commits to building teachers' capacity and qualifications, so it is not yet in place. The gap type is not assessed, because the document does not say how far this has got.

  4. 4 · What to fund

    High priority Trainer Upskilling & Training-of-Trainers Program · start as a pilot / proof of concept · typically €0.1–0.5M over 6–12 months

    An indicative range for this project type and scale, not a costing.

Document-based, on purpose

TVET.AI analyses the documents you provide against a library of published sources. It does not consult stakeholders, visit sites, check data in the field or carry out statistical analysis. Every report says so in its Limitations section.

This is what makes the work checkable: every claim points to a page you can open. Where a document doesn't give enough to go on, the report says "insufficient evidence" instead of guessing. The field work, the interviews and the judgement stay with you, and TVET.AI gives you a documented starting point for them.

What a report is, and what it is not

A report supports decisions. It is not legal, financial, procurement, engineering or other professional advice, and it does not replace the judgement of qualified people. Before you rely on a report for a funding, procurement, investment or policy decision, have it reviewed by someone qualified.

A verified quotation shows that the quoted words appear on the page cited. It does not show that the source is accurate, current, complete or applicable to your case.

The reference library does not cover every country or topic. A report may miss relevant issues or sources.

Sample report

Excerpt: 3 of 8 paired findings

African Development Bank appraisal report, Botswana, 2009

Overview

  • 10 issues the document itself states
  • 8 paired with practice from elsewhere
  • 2 stated, but no practice that could be paired
  • 9 practices, each quoted with its page
  • 3 fundable project shapes
  • 1 lab type, no brands

How it was made: Read 3 times independently (11 issues found); an independent checker confirmed 10 of 11; 10 searches of the reference library gave 29 passages; 9 practices kept and 9 rejected; 8 priorities, 3 projects, 1 lab; 21 of 21 release checks passed. About 29 minutes.

Finding 1 · Quality Assurance & Accreditation

The development of standards and indicators

What the document says

“This has created a need for the development of standards and indicators which will be utilized to drive the process of transforming the Botswana education.”

page 5

What others have done

Rwanda planned only

“This ESSP will have a balance of input-related indicators and outcome-output related indicators that capture actual performance against agreed competencies and standards.”

page 71 · Education Sector Strategic Plan 2018/19 to 2023/24. Republic of Rwanda, Ministry of Education, 2018. Licence: none stated; public government publication, quoted with attribution.

The gap

The document itself states this need. Gap type: complete absence.

What to fund

High priority Institutional Strengthening Package, starting at a single institution, typically €0.5–2.0M over 12–24 months.

Finding 3 · Data, Monitoring & Information Systems

An efficient management information system

What the document says

“Establishment of an efficient management information system to carry out the proposals of human resource growth, job analysis, and other related administrative functions.”

page 22

What others have done

India (Kerala) in place

“The MIS contained quantitative data on all details of the training program (institutions, students, staff, programs, training providers, and industry partners), along with gender, inclusiveness, and geographical spread.”

page 13 · Validation Report: India: Supporting Kerala's Additional Skill Acquisition Program in Post-Basic Education. Asian Development Bank, Independent Evaluation Department, 2024. Licence: none stated; public donor publication, quoted with attribution.

The gap

Not yet in place, according to the document, which plans to put it in place.

What to fund

High priority TVET Data Systems (EMIS/LMIS) Layer, starting at a single institution, typically €0.3–1.0M over 9–18 months.

Finding 5 · Quality Assurance & Accreditation

The newly formed Botswana Examinations Council (BEC), for Primary and Secondary Education

What the document says

“Strengthen the newly formed Botswana Examinations Council (BEC) by developing of a comprehensive Assessment Policy for Primary and Secondary Education” (the sentence continues in the document)

page 21

What others have done

South Africa planned only

“Quality Councils should use external assessment to reveal poor performance. They must investigate institutions where learners consistently perform poorly, and institute remedial or capacity-building measures.”

page 92 · White Paper for Post-School Education and Training. Department of Higher Education and Training, South Africa, 2013. Licence: none stated; public government publication, quoted with attribution.

The gap

Not assessed, because the document does not say how far this has got.

What to fund

Medium priority Institutional Strengthening Package, starting at a single institution, typically €0.5–2.0M over 12–24 months.

Priority bands come from a fixed table (theme maturity × feasibility); they are not scored, because the document states no severity. Budget and time are indicative ranges for the project type and scale, not a costing.

Try it on your own document.

Request pilot access